top of page

![]() | ![]() | ![]() |
---|---|---|
![]() |
Introduction
The Capstone Project Electronic Portfolio (CPEP) is a web‐based project and information center. It contains material produced for a year‐long Senior Thesis class. Its purpose, in addition to providing central storage of individual assignments, is to foster communication and collaboration between student, faculty consultant, course instructors, and industry consultants. This website is dedicated to the research and analysis conducted via guidelines provided by the Department of Architectural Engineering. For an explanation of this capstone design course and its requirements
Welcome to CPEP
Calvin and Janet High Center for Worship and Performing Arts serves as a worship center and theater, large lecture hall/theater, recital and practice spaces; studio and gallery for Messiah College. My senior thesis research stuides existing building systems. My goal is to seek for solutions to enhance building performance with a focus on Mechanical systems.

12.09.16 Proposal
12.05.16 Final CPEP Review
11.11.16 Tech Report 3 Posted
10.31.16 Abstract submitted on display
board
10.24.16 Abstract posted on CPEP
10.19.16 Building Statistics Part 2 - Posted
on CPEP
10.14.16 Tech Report 2 Posted
10.03.16 Building Statistics Part 1 - Posted
on CPEP
9.30.16 Abstract Color and Content -
Electronic Draft
9.23.16 Tech Report 1 posted
9.16.16 Bio Sketch Peer Review &
Corrections
9.16.16 Bio Sketch Posted
9.12.16 CPEP Full Menu Functional
9.07.16 Career Fair Hosting
9.06.16 CPEP Home Page Draft
9.02.16 Building Statistics Part 1 -
Electronic Draft
8.31.16 Mailed AE Dept. Thank You
Letters to primary contacts
8.29.16 Attended CPEP Seminar
8.26.16 Sent Personal Note or Thank You
Letters to primary contacts
8.26.16 Turned in Project Initiation
Checklist Part 2
8.26.16 Turned in Project Initiation
Checklist Part 1
8.09.16 Confirmed and/or Corrected
Master List Information
6.20.16 Obtained Project Documentation
(drawing, specs, etc.)
6.20.16 Owner Permission Received
NEWS FEED
SPRING2017
bottom of page